Most landlords set the buildings sum insured when they first bought the property, then let it roll forward each year with a small index-linked increase. The trouble is that labour and materials have gone up far faster than that, and the figure on many schedules no longer reflects what it would cost to rebuild.
Rebuild cost is not market value
Your sum insured should be the cost of clearing the site and rebuilding the property to the same standard, including professional fees and any work needed to meet current building regulations. It has nothing to do with what the house would sell for. A two-up two-down terrace in Heaton might sell for less than it costs to rebuild, while a flat in Jesmond might be the other way round.
For older stone-built or listed homes the gap can be large, because matching materials and specialist trades cost more than a standard new build.
Why being underinsured matters, even for small claims
Many buildings policies include an average clause. If the insurer finds you were insured for 75% of the true rebuild cost, they can pay 75% of any claim, not just a total loss. So a £20,000 escape of water claim could become a £15,000 payment, with the rest coming out of your pocket.
You can try this on our homepage with the underinsurance check. Move the sliders to your own figures and see how a claim would be settled.
How to check your figure
- Look at the date the sum insured was last properly assessed, not just index-linked.
- Use a recognised rebuild cost calculator for standard houses, or ask a chartered surveyor for a reinstatement valuation on larger, older or listed buildings.
- Include outbuildings, boundary walls, driveways and any extensions or loft conversions added since you bought.
- Allow for professional fees, debris removal and the extra cost of meeting current regulations.
Portfolios need the same attention
If you own several properties, it is easy for one or two to slip. We review every address on a portfolio policy at renewal and flag any where the sum insured looks low compared with its size and construction.
If you are not sure your figures are right, send us your current schedule. We will tell you where we think the gaps are and what it would cost to put them right.

